Skip to product information
All-Over Print Men's Curved Hem Long Tank Top
$25.00
Sale price
$25.00
Regular price
Can team the bodybuilding stringer with various sweat pants, jogging pants, compression pants, Jersey pants and bermuda shorts, etc.
- Fabric: Jersey(95% polyester and 5% spandex)
- Regular fit
- Sleeveless, curved hem, slightly longer back
- Fabric weight: 180g/m²
- Stitch Color: black or white, automatically matched based on patterns.
- Average Lead Time: 2-4 business days(The first month delivery of new products is about 7 business days)
- Care Instruction: machine wash cold with similar colors, do not bleach, tumble dry low, do not iron, do not dry clean.
- This product is made on demand, with no minimum order quantity.
- Multiple shipping methods available, and fees vary depending on the location and the shipping method selected.
- For custom areas, please refer to the Yoycol mockup generator for details.
- Notice: a variety of factors may cause slight differences between the actual product and the mock-up, including but not limited to colors and precision of elements position.
Size Guide
| Inch | S | M | L | XL | 2XL | 3XL | 4XL | 5XL |
| Front Length | 29.1 | 30.3 | 31.1 | 32.3 | 33.1 | 34.3 | 35.0 | 36.2 |
| Back Length | 31.1 | 32.3 | 33.1 | 34.3 | 35.0 | 36.2 | 37.0 | 38.2 |
| Shoulder | 11.4 | 11.8 | 12.2 | 12.6 | 13.0 | 13.4 | 13.8 | 14.2 |
| Bust | 33.1 | 37.0 | 40.9 | 44.9 | 48.8 | 52.8 | 56.7 | 60.6 |
| Centimeter | S | M | L | XL | 2XL | 3XL | 4XL | 5XL |
| Front Length | 74.0 | 77.0 | 79.0 | 82.0 | 84.0 | 87.0 | 89.0 | 92.0 |
| Back Length | 79.0 | 82.0 | 84.0 | 87.0 | 89.0 | 92.0 | 94.0 | 97.0 |
| Shoulder | 29.0 | 30.0 | 31.0 | 32.0 | 33.0 | 34.0 | 35.0 | 36.0 |
| Bust | 84.0 | 94.0 | 104.0 | 114.0 | 124.0 | 134.0 | 144.0 | 154.0 |
This size guide shows product measurements taken when products are laid flat. Actual product measurements may vary by up to 1".